Golden B.C., Mainline Weigh Station
Goldcliff helped relocate, update, and install a weigh-in motion system with mainline tracking sensors. The system scales vehicles, collects information, captures images, and reads vehicle identification while driving. Information is sent via fiber optic cable to the weigh-in station, and trucks are then directed to bypass or report to the station.
John Hindle Drive, Kelowna, B.C.
Goldcliff was in charge of the installation of both the street lights on John Hindle Drive and all of the intersection components.
City of Kelowna Streetlight Maintenance Contract (2018, 2019)
Since 2018, Goldcliff has been been awarded a retainer with the City of Kelowna for their streetlight maintenance, which includes cleaning, monitoring, and maintaining poles, signals, wiring and street lights.
Bernard Ave, Kelowna B.C.
Goldcliff was responsible for the installation of intersection components on Bernard Ave., as well as the rewiring and installation of street lights, gobo projector lights and LED bench lights.
30th St Vernon, B.C. – Ph. 1-3
Goldcliff had the privilege of completing the first three phases of the 30th Street intersection and street light installation, as well as the underground work associated with shallow utilities.
Sutherland Ave, Kelowna B.C.
Goldcliff completed the intersection revitalization of Sutherland Ave, which included the bike lane, counter loops and lighting, as well as the fiber optic interconnect between intersections.